Sherwood SRB3200 Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Palmes de plongée sous-marine Sherwood SRB3200. Sherwood SRB3200 User's Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer

Résumé du contenu

Page 1 - REGULATORS

®REGULATORS(SRB3300)(SRB3400)(SRB3500)®®®Assembly & Maintenance GuideIncludes(SRB3200)®

Page 2

a. Keep greasy fingertips away from the flow element during servicing. b. Use a clean, dry cloth to wipe the piston surface if it needs cleaning.c. Do

Page 3 - TABLE OF CONTENTS

The sealing surface on the body where the one-way valve seals must be totally clean of deposits. If any deposits remain on the sealing surface after i

Page 4 - 1.0 INTRODUCTION

4.3 ASSEMBLY OF FIRST STAGE1. The part number for each regulator kit can be found in Sherwood’s Tools, Repair Kit andAccessories - Assembly & Ma

Page 5

13. Install the handwheel and the dust cap onto the yoke.14. If the first stage has a SAA-5300 DIN adapter installed instead of a standard

Page 6 - 2.0 SPECIFICATIONS

C. Intermediate Pressure Test1. Attach any Sherwood second stage to one of the low pressure ports, and the Sherwoodintermediate pressure gauge (p/n TL

Page 7 - 3.0 O-RINGS REFERENCE CHART

5.0 SECOND STAGE PROCEDURES5.1 TOOLS REQUIRED FOR SECOND STAGE SERVICING– Two good quality 6" or 8" (15 or 20 cm) adjustable wrenches– #10 T

Page 8 - 4.0 FIRST STAGE PROCEDURES

13a. Place the cover assembly with the purge button logo face down on a clean flat surface.b. From the inside of the cover assembly, push the four b

Page 9 - Photo #1

13. If parts of the lever assembly (stem, spring, lever, etc.) need to be replaced, take apart theassembly with the Sherwood stem socket tool (p/n

Page 10 - Photo #2

5. Screw the orifice housing onto the threads of the lever assembly. With a 13/16” wrench onthe orifice housing and a Sherwood modified 3/4” dee

Page 11 - Photo #3

4. Turn on the air. Use the in-line adjusting tool to turn the adjusting orifice counter-clockwiseuntil you hear a slight hissing. Then turn the

Page 12 - 4.3 ASSEMBLY OF FIRST STAGE

FIRST STAGE - MAGNUM®II SRB3300, BLIZZARD® SRB3200, OASIS® SRB3400NOTE: The Oasis®+ SRB3500 uses the SRB3601 externally adjustable first stage. The pa

Page 13 - B. Dry Air Bleed Flow Test

11. Replace the diaphragm. Continue to test the gap between the lever and the diaphragm aftereach bending until the lever is in the correct position.1

Page 14 - C. Intermediate Pressure Test

D. External Air Leaks1 Attach the regulator first stage to a tank short enough to totally submerge the first and secondstage in your filling station c

Page 15 - 5.0 SECOND STAGE PROCEDURES

6.0 HELPFUL HINTS6.1 TROUBLESHOOTING REGULATORSPOSSIBLE CAUSE RECOMMENDED ACTIONA. High Inhalation Effort at Depth: 1. Inlet filter clogged. Replace

Page 16

C. Wet Breathing:1. Improper clearing, or diver diving in total Instruct the diver on proper clearing head-down position. technique.2. Diaphragm impro

Page 17 - 5.3 ASSEMBLY OF SECOND STAGE

6.2 PARTS CLEANING RECOMMENDATIONSRegulators which see heavy use, particularly those used in salt water, often require extra effortto remove dirt and

Page 18 - 5.4 SET- UP OF SECOND STAGE

6.4 HANDLING TIPSHow your customers treat their regulators will directly influence the unit’s function and durability. Following are a few tips that y

Page 19 - Photo #4

7.0 TWO YEAR WARRANTY AND MAINTENANCEINFORMATION7.1 PROPER PROCEDURE FOR WARRANTY PAPERWORK1. For detailed information on the operation of Sherwood S

Page 20 - C. Leak Test

ITEM # CATALOG # DESCRIPTION 1 ...3207-2 ...Label 2 ...3004-1 ...

Page 21 - D. External Air Leaks

Printed in the U.S.A on recycled paperSherwood Scuba, the SS symbol, Oasis, Blizzard, Magnum, Brut and Wisdomare trademarks of Sherwood, Harsco Corpor

Page 22 - 6.0 HELPFUL HINTS

TABLE OF CONTENTSPage1.0 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .12.0 Specifications . . . . . . . . .

Page 23 - C. Wet Breathing:

11.0 INTRODUCTION1. The procedures in this manual apply to the Sherwood Scuba MAGNUM II (SRB3300), OASIS (SRB3400), and OASIS+ (SRB3500).The most cur

Page 24

6. Companion instructional VHS videotapes to this and other Sherwood Scuba repair manuals areavailable from Sherwood Scuba at a nominal cost. Ask your

Page 25 - B. Post-Dive Care

2.0 SPECIFICATIONS2.1 SPECIFICATIONS FOR THE SRB3300 MAGNUM® II, SRB3400 & SRB3500 OASIS® REGULATOR MODELS: Sherwood Magnum II SRB3300,Oasis SRB3

Page 26 - INFORMATION

3.0 O-RINGS REFERENCE CHART1. Before you begin disassembly of the regulator, test the first and second stages for output pressures and leakage. Pre-te

Page 27 - ITEM # CATALOG # DESCRIPTION

4.0 FIRST STAGE PROCEDURES4.1 TOOLS REQUIRED FOR FIRST STAGE SERVICING– Bench vise– 3/32" Allen wrench– 5/32" Allen wrench– 6" or 8&quo

Page 28 - Clarence Ctr, New York 14032

4. Use a 5/32” Allen wrench, and a small adjustable wrench to remove all port plugs andhoses from the body.5. Install a Sherwood regula

Commentaires sur ces manuels

Pas de commentaire